BCA Heating & Plumbing’s Complete Guide to a Grimsby Bathroom Renovation

new grimsby bathroom

 

Crafting Comfort: BCA Plumbing’s Complete Guide to a Grimsby Bathroom Renovation

Introducing our comprehensive approach to bathroom renovation at BCA Plumbing. With years of expertise and a commitment to excellence, we take pride in transforming outdated bathrooms into modern, functional spaces. Here’s how we tackled the removal of an old bathroom in Grimsby, installation of a new one with the addition of stylish bathroom panels.

Assessment and Planning

– We started by assessing the existing bathroom layout and condition. We determined the scope of work required for removal and installation.

– Next we consulted with the client to understand their preferences, budget, and any specific requirements for the new bathroom.

– Based on this information, we created a detailed plan outlining the steps and timeline for the project.

Removal of Old Bathroom

– We began by shutting off the water and electricity supply to the bathroom to ensure safety during the removal of the old bathroom.

– We then removed fixtures such as the toilet, sink, bathtub/shower and any cabinets.

– The flooring was then removed and disposed of accordingly.

Plumbing Preparation

– Once the old fixtures were removed, we inspected the plumbing infrastructure.

– Any pipes or fittings that were damaged or worn we replaced.

– As we didn’t need to relocate the toilet or sink, no major plumbing works was needed.

Installation of New Bathroom

– We began by installing the new fixtures, such as the bathtub/shower, toilet, sink, and taps.

– Once these were connected, we ensured that all the fixtures were securely fixed so there wouldn’t be any issues when in use.

– Walls are prepared for the installation of bathroom panels, ensuring they are smooth and free of imperfections.

Installation of Bathroom Panels by Our Partners at JMA Joinery & Building Services

– JMA measured the walls precisely to determine the required size and number of panels.

– They then cut the panels to fit the space accurately, ensuring they align seamlessly with one another.

– The panels were securely attached to the walls using adhesive.

– We then applied sealant along the edges and joints to prevent water penetration and ensure a watertight seal.

– Any necessary finishing touches, such as trim pieces or corner profiles were installed to enhance the appearance and durability of the panels.

Final Inspection and Testing

– Once the installation was completed, we conducted a thorough inspection of the entire bathroom.

– We checked for any leaks and made sure the fixtures worked as they should.

Completion and Handover

– Once we made sure the client was happy we cleaned up the work area, removed any debris and ensured the bathroom is left tidy.

Throughout the entire process, we prioritised communication with the client, attention to detail, and quality workmanship to ensure the successful completion of the project to the client’s satisfaction.

If you’d like your bathroom to have a stylish makeover, send us a message and let’s us make you Bathroom dreams become a reality.